1
Question
A construction schedule is prepared after collecting
2
Question
A CPM family includes
3
Question
A critical ratio scheduling
4
Question
A dummy activity
5
Question
A golden rule for the procurement of construction stones, suggests
6
Question
A Milestone chart
7
Question
An event is indicated on the network by a number enclosed in
8
Question
Assertion (A): Activity 57 is critical. Reason (R): Earliest finish time and latest finish time for events 57 are same Select the correct answer.
9
Question
Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing. Reason R: If the angle of swing is decreased, the cycle time will be decreased. Select the correct answer.
10
Question
At a work site, statistical quality control of concrete means
11
Question
Bar charts are suitable for
12
Question
Batching refers to
13
Question
Completion of an activity on CPM network diagram, is generally known
14
Question
Construction team means
15
Question
CPM is
16
Question
Crash project duration is obtained by summing the
17
Question
Critical path
18
Question
Critical path lies along the activities having total float
19
Question
Critical path method
20
Question
Critical Path Net Work helps an engineer
21
Question
During the construction period, price variation clause in contracts caters to
22
Question
Earliest finish of an activity is always
23
Question
Economic saving of time results by crashing
24
Question
Final technical authority of a project lies with
25
Question
For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days respectively, The expected time is
26
Question
For a given size of bucket, the ideal output of a dragline will be least in
27
Question
For completion of a project, the critical path of the network represents
28
Question
For excavating utility trenches with precise control of depth, the excavation equipment used is
29
Question
For the execution of a project, a contractor is
30
Question
For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is
31
Question
Frederick W. Taylor introduced a system of working known as
32
Question
Free float for any activity is defined as the difference between
33
Question
Free float is mainly used to
34
Question
Frequency distribution curves
35
Question
Henry Gantt developed Bar charts for planning and scheduling of projects in
36
Question
If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is
37
Question
If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively
38
Question
If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good
39
Question
If t is the duration of an activity, t1 is the latest finish possible moment of its preceding activity and t2 is the earliest start possible moment, the independent float of the activity is
40
Question
If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be
41
Question
If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the expected time of completion of the project with 99.9% probability is
42
Question
If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be
43
Question
If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
44
Question
If TL is the latest allowable event occurrence time, total activity slack(s), is equal to
45
Question
In CPM analysis,
46
Question
In PERT analysis, the time estimates of activities and probability of their occurrence follow
47
Question
In resources levelling
48
Question
In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having
49
Question
In time-cost optimization of a project, crashing is done.
50
Question
Interfering float is the difference between
51
Question
Mile Stone charts were invented in the year of
52
Question
Mobilization advance up to 20% of the cost of work is given to a contractor
53
Question
Modular co-ordination of construction means proper
54
Question
PERT analysis is based on
55
Question
PERT is
56
Question
PERT technique of network analysis is mainly useful for
57
Question
Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
58
Question
Pick up the correct statement from the following:
59
Question
Pick up the incorrect statement from the following:
60
Question
Pick up the PERT event from the following
61
Question
Preliminary project report for a road project must contain
62
Question
Pre-tender stage requires
63
Question
Select the correct statement.
64
Question
Select the incorrect statement.
65
Question
Sensitivity analysis is a study of
66
Question
Sinking fund is
67
Question
Site order book is used for recording
68
Question
Slack time refers to
69
Question
The area under the Beta distribution curve is divided into two equal parts by
70
Question
The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as
71
Question
The constraints in case of resource smoothening operation would be
72
Question
The critical activity has
73
Question
The difference between the time avail-to do a job and the time required to do the job, is known as
74
Question
The direct cost of a project with respect to normal time is
75
Question
The estimated time required to perform an activity, is known as
76
Question
The final selection of a construction site, is done by
77
Question
The first method invented for planning projects, was
78
Question
The first stage of a construction, is
79
Question
The independent float affects only
80
Question
The main advantage of line organisation is:
81
Question
The main disadvantage of line organisation, is
82
Question
The main principle of an organisation, is
83
Question
The most popular type of organisation used for Civil Engineering Constructions, is
84
Question
The most suitable type of equipment for compaction of cohesive soils is
85
Question
The object of technical planning, is
86
Question
The Overall in-charge of an organisation at the site responsible for the execution of the works, is
87
Question
The performance of a specific task in CPM, is known
88
Question
The process of incorporating changes and rescheduling or replanning is called
89
Question
The reduction in project time normally results in
90
Question
The salient feature of functional organisation is
91
Question
The technique for establishing and maintaining priorities among the various jobs of a project, is known
92
Question
The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as
93
Question
The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as
94
Question
The time corresponding to minimum total project cost is
95
Question
The time which results in the least, possible construction cost of an activity, is known as
96
Question
The time with which direct cost does not reduce with the increase in time is known as
97
Question
Time and progress chart of a construction, is also known as
98
Question
Total float for any activity is defined as the difference between
99
Question
Updating may result in
100
Question
Various activities of a project, are shown on bar charts by
101
Question
Whenever an activity has zero total float, then
102
Question
Which of the following is a weakness of bar chart?
103
Question
Which of the following is not a PERT event?
104
Question
Which one of the following represents an activity?
105
Question
Which one of the following represents an event?
106
Question
While filling the tender for any work, the contractor considers
107
Question
While scheduling a project by C.P.M.